INTERSTATE VENTURES, INC. PRESENTS
THE “PURPOSE” OF OUR PROGRAM AND
THE PROCESSING PROCEDURE TO ACHIEVE IT

PURPOSE: Because there are so many details that must be completed correctly, it is difficult for an individual to perform all of the preliminary tasks that are necessary in order to start and complete a new custom home. We have designed a CONSTRUCTION ADVISORY PROGRAM as a preliminary to beginning the design and construction of your new home. The following services are explained in detail so that you will understand the total construction process.

1. LOT PURCHASE: You should avail yourself of this service either before you purchase a lot, or just after the transaction. By reviewing your purchase we can give you insight where we see possible problems, and try to give you the solutions to them that will minimize your costs.

2. ENGINEERING:
A. PRELIMINARY – We review the possible house orientations, the cost effectiveness of the house location, and give oversight into the final engineering plan.
B. FINAL – We schedule engineers for the periodic reviews of construction and review with the engineers the various surveys that are required during and at the end of construction.

3. ARCHITECTURE:
A. REVISION OF EXISTING PLANS: We have on hand various plans of homes that we have built for others. They range in size from 1,000 square feet to 5,000 square feet. Our architect will make changes to meet your specialized criteria as long as the integrity of the plan is not violated.
B. CREATING NEW PLANS: If a new plan is desired, we will start an evolutionary process and help design a home to meet your particular needs. We have over 10,000 plan ideas to use once you have given us a profile on the type of house you want, we have seen the site, and we know your space requirements.
C. COST ESTIMATE OF PLANS:
PRELIMINARY PLANS – Once a concept plan has been initiated we can give a “best guess” estimate based on using comparable homes that we have constructed. This will give you some idea that we are heading in the right direction. Adjustments can be made at this time – as to size, options, and price.
D. FINAL PLANS – Once you have given your approval to the Preliminary Plan, so that it can be given to the architect in order to draft the construction drawings, we can make a final price determination and execute a contract.

4. PROCESSING PRIOR TO CONSTRUCTION:
A. COUNTY PROCESSING FOR PERMITS AND OTHER FEES – We act as liaison with all County officials to try to expedite the processing for a building permit and advise you of the fees necessary to accomplish this; plus, informing you of the various fees that are required in any particular County; then we inform the engineer and architect if the County requires them to make any revisions in order to comply with the Building Codes.
B. FINANCIAL PROCESSING FOR CONSTRUCTION & PERMANENT LOANS:-- Our Financing Associates advise you of the various rates lenders are charging for the type of loan you are seeking. They help prepare the document package for you to present to the lender; and maintain contact with the lender or their representative to try to expedite the processing and your final approval. Also, to advise you of any problems that might arise and try to help you overcome them.
C. ESTABLISH AN ESCROW TO INSURE FUNDING DURING CONSTRUCTION – This is probably the most important part of all the services rendered. There are two situations that the parties to a home construction are concerned about The Homeowner - That all funds supplied are going into the construction of the home and only necessary overhead expenses are available to the Builder during construction. Not all construction draw schedules provide funds exactly as expended; so that there are deficiencies and excesses over actual payments all through the project. The Builder – That the funds required to pay for all material and labor is available as it becomes due for payment. Since the Builder is lending their credit to provide for any deficiencies, they must know that it will be repaid from any excess funds, as received. Therefore, all constructions funds are placed in an escrow account by the Lender which provides both parties with the security that is needed. The Builder draws from those funds only the amount designated by the Lender’s inspection for actual work-in-place. Once the project is completed, the Occupancy Permit received, and the Lender has inspected the home for completion; only then can the balance in the escrow account be released. If during construction the Builder makes a mistake in the selling price, he is responsible for delivering at that price, unless changes are made by the Buyer. Any excess cost incurred is borne by the Builder and not by the Buyer.

5. SITEWORK:
Because each property is different, this work is done in consultation
with the Owner at the Actual Cost to the Builder.
A. SITE PREPARATION PRIOR TO CONSTRUCTION – We oversee the clearing and grubbing of the area to be excavated, plus any other areas
determined for modification; order stake-outs for the house and limits of clearing.
B. EXCAVATION & INSTALLATION OF UTILITIES – We oversee these items and establish the necessary inspections to determine the correctness of the installation.
C. FINAL SITE WORK – This involves oversight of the final grading, installation of lead walks and driveways to assure the final County and Lender approval. Also, seeding, sodding or landscaping if required.

6. DIRECT CONSTRUCTION COSTS:
A. EMPLOYMENT OF TRADES & SELECTION OF MATERIAL SUPPLIERS
Over the forty years that we have been in the construction industry we have associated with many trades and materialmen. Some have proven very excellent in workmanship and the material used; some have not. We have tried to eliminate all those that have not. Because we build in multiple communities, we can command competitive pricing from the contractors and materialmen. These savings are passed on to you when we compute the final cost of construction.
B. SCHEDULING – When contractors are busy this can be a difficult task. Because we pay our bills on time, we can command competitive pricing and know the contractors will employ their best-efforts to give us priority in scheduling.
C. INSPECTIONS BY - COUNTY, PRIVATE INSPECTORS AND ENGINEERS
In order to insure that your house is constructed according to all codes, the County and the Lender inspect to assure compliance to a certain degree. On houses that we construct we employ a structural engineer that checks after certain stages to see that the quality of work completed is satisfactory before making final payments. We coordinate these inspectors and meet with County inspectors to act as liaison with the engineer or trades, if there is a problem. We require the owner to inspect the house prior to applying the drywall, in order to see that everything is in its proper place. It is easy to make corrections prior to closing in the walls; a final inspection is made prior to receiving the Occupancy Permit.

7. DURATION OF PROJECT – Producing a Custom Home is quite different that buying a Production Home. In Production Housing all the thinking has been done for you, and you buy the product that is presented. In Custom Housing we start with a blank piece of paper. All thoughts are new and have to be reviewed for feasibility of design. If everyone cooperates and the plan is accepted, it should take 90 to 120 days to starting. The construction period depends on many things,; i.e. weather, the ability of the Owner to make quick decisions, all contractors complying with our proposed schedule, the amount of changes made after construction begins. The timeframe for construction is six to eight months depending on the complexity of the home.

8. WARRANTY – Under Maryland law all Builders must be registered with the States Attorney’s Office and offer the State Warranty. This warranty covers mechanical defects for a one year period, and structural defects for a two year period. We comply with this warranty.

9. FINAL TRANSITION PERIOD — Ever since we have been building homes the most anxious period for any of our Buyers who have homes to sell is – when their home is sold and they have a definite moving date so their buyers can occupy their home. The problem when our Buyer commits to this date can pose a problem. No matter how good-intentioned we are, and no matter what date to occupy your new home that we give you; nine chances out of ten, it will not happen. Unforeseen delays always occur at the last minute that messes things up; i.e. weather, county inspections, contractor not meeting their schedule, etc. We try to advise our Buyers to insert one phrase in their contract; “that settlement on their existing home will coincide with the occupancy of their new home”. If your buyers are amenable, you could go to settlement and rent your existing home until you can occupy your new home. Feel free to discus this with our Sales, Financing or Management Personnel.

It is our intent to produce a quality home which will increase in value over the years; Therefore we offer you the above building services in order to give you the ability to create an affordable custom home where your investment is protected because you receive quality construction. Our programs are flexible and imaginative, so that is you will state your housing objectives we will try to give them direction and help you attain your goals.

Call us to make a no obligation interview with our consultants by phone or at our display center. These services are available to anyone interested in buying a custom home. We do it all for you within your financial goals building the home that meets all of your needs. your time is worth money Enroll in our program today.
 

INTERSTATE VENTURES
Sales Center:
#1 Rhonda Ct.
Baltimore, MD 21244
work: (410) 879-4242
Fax: (301) 622-3033
Email: SR9889@aol.com